Warehouse and Factory Epoxy Floor Coating: Planning, Preparation and Application

Bare concrete floors in warehouses and factories dust, absorb oil and chemicals and are hard to keep clean. A seamless epoxy floor makes the surface easier to clean, more resistant to wear and better looking. This guide explains how to plan an epoxy colored-sand self-leveling floor for industrial buildings, with the product data from our technical documents.
The problem
Untreated concrete wears under trolleys and pallet trucks and releases dust that settles on stock and machines. It absorbs oil, which leaves permanent stains and makes floors slippery. Joints and broken edges collect dirt and break further under wheels. Food, pharmaceutical and electronics plants also need floors that are easy to clean and free of dust.
An epoxy floor coating seals the concrete with a continuous, seamless surface that is easy to clean. Our epoxy colored-sand self-leveling floor coating also gives a decorative, marble-like look with colored quartz sand.
Recommended Kangwangqi products
- Epoxy Colored-Sand Self-Leveling Floor Coating – Two-component (A : B = 8 : 1 by weight), water-based, solvent-free system, described on the product page as very low VOC. Theoretical consumption approx. 1.5–2.5 kg/m²; usable on cement floors and old tile floors; matte, semi-gloss or high-gloss. The product page describes it as designed for wear, heavy loads and impact and for resistance to many acids, alkalis, salts and oils – tell us the traffic and the chemicals that will reach your floor so we can confirm it suits your conditions. Documents: our certificates page lists a French A+ VOC emission certificate (TBT2606023-1), a RoHS test report (SH2602192, main component tested) and an EN 1504-2:2004 Verification of Conformity (DPWD/3521/25/KF/26, types H0230–H0238), each issued for a two-component epoxy coating. Contact us to confirm documentation for your selected coating.
Plan the quantity
Theoretical consumption is approx. 1.5–2.5 kg/m². For example, a 500 m² warehouse floor needs roughly 750–1,250 kg before allowing for waste, depending on the substrate and the build-up. Component A is supplied in 27 kg buckets with hardener B. Use our coverage calculator for your area, and read epoxy floor coating coverage, thickness and cost per m².
Application conditions on the product page are 10–30 °C and relative humidity below 75 %; confirm them in the TDS for your batch. In hot, humid climates, plan work for the cooler hours, keep materials in the shade and mix only what can be applied within the pot life (approx. 40 minutes at 25 °C; shorter at higher temperatures).
Surface preparation
- Check the concrete: it must be sound, fully cured and dry; rising damp must be dealt with before coating.
- Grind or shot-blast to remove laitance, old weak coatings and contamination and to open the surface.
- Degrease oil-stained areas; oil left in the concrete prevents adhesion.
- Repair cracks, holes and broken joint edges; plan how existing joints will be treated.
- Vacuum all dust immediately before priming.
Application steps
- Follow the system: surface preparation, primer, mid-coat, top-coat, curing and inspection.
- Mix component A and hardener B at 8 : 1 by weight, thoroughly.
- Trowel the material, then use a spiked roller to remove air bubbles.
- Respect the drying times on the product page (surface dry ≤ 12 h, hard dry ≤ 48 h; recoat interval 12–24 h under standard conditions after full drying) and confirm them in the TDS for your temperature and humidity.
- Foot traffic after 24–48 h and normal use after 7 days of curing, as stated on the product page; check the TDS before putting heavy loads on the floor.
These are general steps. Always follow the Technical Data Sheet (TDS) and Safety Data Sheet (SDS) for the product and grade you use; values not shown on our product pages are provided in the TDS on request.
Buyer checklist – what to send us
- Floor area in m² and the number of areas or rooms
- Traffic: pedestrians, trolleys, pallet trucks, vehicles
- Chemicals or oils that will reach the floor
- Substrate: concrete (age, condition) or old tiles
- Colour (8 standard colored-sand colours, custom on request) and gloss level
- Destination port; minimum order is 100 kg
- Please also share: project location, area (m²), substrate, existing coating condition and quantity – we use these to recommend the product, grade and TDS values for your job.
FAQ
How much epoxy floor coating do I need per m²?
Theoretical consumption is approx. 1.5–2.5 kg/m². Use our coverage calculator and add an allowance for waste and the substrate condition.
Can the coating be applied over old tiles?
Yes. The epoxy colored-sand coating can be used on cement floors and on old tile floors, which suits renovation work.
How soon can the floor be used?
Foot traffic after 24–48 hours and normal use after 7 days of curing, under the stated conditions.
Can I apply it in hot, humid weather?
Apply at 10–30 °C and relative humidity below 75 %. Work in cooler hours, keep materials shaded and mix only what you can apply within the pot life.
Is the coating suitable for food plants?
Food plants and GMP workshops are among the typical uses listed on the product page. The French A+ certificate on our certificates page is a VOC emission class issued for a two-component epoxy coating; it is not a food-contact approval. Tell us which documents your client or authority requires and contact us to confirm documentation for your selected coating.
Next steps
Get a quote: send the product, area (m²) or quantity and destination port via the quote request form, WhatsApp or email. Reference prices on our product pages are EXW factory, Foshan; FOB / CIF to your port quoted on request.
Documents: Available documents are listed with their applicable products on our certificates page. Contact us to confirm documentation for your selected coating.
Related guides:
More application guides:

